Aarna 2026 Pricing — One Page, All Services
Every Aarna service line, every tier, every per-unit cost — consolidated on one page. Updated quarterly. Numbers below are the same numbers we put in your written quote.
Find your service in the index; click through to the detailed guide for that service. Numbers here are 2026 reference ranges; your specific quote depends on plot location, scope, finishes, and current material prices. Free site visit + itemised quote within 48 hours of enquiry.
House & villa construction
Turnkey per-sqft cost in Greater Noida / Noida / Jewar / YEIDA. Excludes plot cost, sanction fees, and architect plan fees.
| Tier | Per sqft (turnkey) | What it includes |
|---|---|---|
| Basic | Rs 1,650 | Fe500D steel, M20 RCC, ISI bricks, vitrified flooring, distemper paint |
| Standard | Rs 1,850 | + Indian premium tiles, modular kitchen base, branded fittings, emulsion paint |
| Premium | Rs 2,100-2,400+ | + Indian marble, smart wiring base, premium kitchen, Royale paint, landscape basics |
| Luxury (villas) | Rs 2,400-2,800+ | + Imported finishes, smart-home wiring, Caesarstone, designer fixtures |
| Full construction details → Per-sqft cost breakdown → | ||
Interior design (turnkey)
Full interior turnkey including modular kitchen + wardrobes + false ceiling + paint + lighting + curtains. Excludes loose furniture unless specified.
| Flat type | Budget / Standard / Premium | Typical timeline |
|---|---|---|
| 1BHK (550-650 sqft) | Rs 4-7 L | 6 weeks |
| 2BHK (900-1,200 sqft) | Rs 6-12 L | 8 weeks |
| 2.5BHK / 3BHK (1,200-1,650 sqft) | Rs 10-18 L | 10 weeks |
| 3.5BHK / 4BHK (1,650-2,400 sqft) | Rs 15-26 L | 12 weeks |
| Villa (2,500-5,000 sqft) | Rs 18-45 L+ | 14-22 weeks |
| Interior designer GN → 2BHK cost → 3BHK cost → Villa interiors → | ||
Home renovation
Full-flat renovation including plumbing rework + electrical rewire + kitchen + bathrooms + paint + flooring polish. Excludes structural changes (priced separately).
| Flat type / scope | Cost | Timeline |
|---|---|---|
| 2BHK refresh (paint + minor fittings) | Rs 1.5-3 L | 3-4 weeks |
| 2BHK full renovation | Rs 4-8 L | 6-8 weeks |
| 3BHK full renovation | Rs 6-15 L | 8-12 weeks |
| Old flat (10+ years) full renovation | Rs 8-18 L | 10-14 weeks (incl. plumbing replacement) |
| Villa renovation | Rs 12-35 L | 14-22 weeks |
| Renovation GN → Renovation Noida → Old flat case studies → | ||
Modular kitchen
Kitchen-only pricing: carcass + shutter + hardware + counter + chimney + hob + sink. Excludes appliances (microwave, dishwasher, RO).
| Layout / tier | Cost | Notes |
|---|---|---|
| 7 ft straight (budget) | Rs 1.2-1.6 L | BWP ply + laminate + Hettich Quadro |
| 10 ft L-shape (standard) | Rs 1.8-2.8 L | Marine ply + acrylic + Hettich Titan |
| 12 ft U-shape (standard) | Rs 2.4-3.5 L | + Indian quartz + auto-clean chimney |
| Island / G-shape (premium) | Rs 3.5-4.8 L+ | Caesarstone + Blum + LED + tall units |
| Per running foot reference | Rs 1,400-5,500 | Carcass + shutter + hardware combined |
| Modular kitchen GN → Kitchen reno Noida → Detailed price guide → | ||
Bathroom renovation
Per-bathroom cost including waterproofing + plumbing rework + tiles + sanitaryware + fittings + vanity + mirror.
| Tier | Per bathroom | Timeline |
|---|---|---|
| Basic refresh | Rs 80,000-1.2 L | 10-12 days |
| Standard upgrade | Rs 1.2-2.2 L | 12-15 days |
| Premium (Kohler / Hansgrohe) | Rs 2.2-3.5 L+ | 15-22 days |
| Waterproofing warranty | 10 years | Crystalline chemistry standard |
| Bathroom reno GN → Bathroom reno Noida → Ideas + costs → | ||
Architects + plan approvals
Architectural fees + plan + sanction + drawing fees. Excludes structural design fees if separate.
| Service | Cost | Notes |
|---|---|---|
| Basic plan + sanction (200 sqyd) | Rs 35,000-55,000 | Floor plan + elevation + GNIDA submission |
| Standard plan + 3D + sanction | Rs 55,000-90,000 | + 3D elevation + revisions |
| Premium full architectural service | Rs 90,000-1.8 L | + structural + MEP drawings + BOQ |
| GNIDA sanction fee (separate) | Rs 2,800-12,000 | By plot size + tier |
| YEIDA sanction fee (separate) | Rs 2,500-10,000 | By plot size band |
| Soil test (mandatory above 150 sqm) | Rs 8,000-12,000 | One-time per plot |
| Architects GN → Architects Noida → YEIDA approval guide → | ||
Office fitout (commercial)
Per-sqft commercial office fitout including workstations + cabins + meeting rooms + flooring + lighting + paint + fire NOC handling.
| Tier | Per sqft | Best for |
|---|---|---|
| Budget (startup) | Rs 800-1,200 | Featherlite Premium, mineral fibre ceiling, vinyl flooring |
| Standard (growth-stage) | Rs 1,200-1,500 | + glass cabins, LVT flooring, branded pantry |
| Premium (client-facing) | Rs 1,500-1,800+ | + Steelcase / Herman Miller, acoustic panels, AV integration |
| Fire NOC (separate, included) | Rs 80,000-1.5 L | Handled in-house, 3-4 week turnaround |
| Office fitout details → Commercial construction → | ||
Other costs to budget for
| Item | Cost | When |
|---|---|---|
| Society NOC + security deposit (Noida flats) | Rs 5,000-15,000 | Refundable, before renovation |
| Material delivery to upper floors (lift access) | Included in quote | Coordinated with RWA |
| Hidden water-damage repair (old flats) | Rs 15-50,000 | Discovered during strip-out, change-order with approval |
| 5A to 15A electrical upgrade (old flats) | Rs 40,000-1.2 L | For full 2BHK/3BHK during renovation |
| GI to CPVC plumbing replacement (old flats) | Rs 35,000-90,000 | For full 2BHK/3BHK during renovation |
| Vastu / Bhoomi puja arrangements | Rs 5,000-15,000 | Before foundation; optional |
| Drone footage / aerial timelapse (for NRI clients) | Free | Monthly during construction |
Aarna quotes are itemised line-by-line — every material, every hardware brand, every labour estimate visible. No lump-sums. Mid-project scope changes go through written change-orders. 7-stage milestone payments tied to delivery (no upfront lumps). For details on our process, see our 10-step interior design process or our fee structure breakdown.
Want a specific quote — itemised, in 48 hours?
Share your plot/flat location + scope. We send a detailed itemised quote with 2-3 tier options, every line broken out.
