Architects in Noida | House Plans & Noida Authority Approval

Noida · COA-registered architects · Since 2017

Architects in Noida — House Plans, Flat Renovation & Society Approvals

Noida-specific architectural services: new plot construction drawings, flat renovation plans, society NOC drawings, 3D elevation, structural certification. From ₹15/sqft of plot or per-drawing pricing. 92% first-pass Noida Authority approval.

200+
Noida plans drawn
92%
First-pass NA approval
3D
Included free
COA
Council-registered
Our services

Architectural services for Noida

Five specialised offerings shaped by Noida's unique constraints: society rules, apartment density, and Authority byelaws.

Architect fees

Fees structure — Noida 2026

~25% premium vs Greater Noida due to Noida Authority overheads and society liaison work. Pick by tier.

Basic

Plan + sanction

Plot up to 200 sqm₹15/sqft
Plot 200-500 sqm₹18/sqft
3D elevation+ ₹18K
Approval supportIncluded
Premium

Villas & commercial

Plot up to 500 sqm₹35/sqft
Plot 500-1000 sqm₹40/sqft
Landscape + lightingIncluded
Project managementIncluded
Noida Authority expertise

Noida Authority approval — handled end-to-end

Noida Authority byelaws are stricter than GNIDA. Knowing them prevents 90% of rejections.

92%
First-pass
NA acceptance rate

What's included

  • Plot zoning verification & Noida Authority byelaw compliance
  • FAR (Floor Area Ratio) calculation per plot size + sector
  • Ground coverage and setback compliance (3-6m typical)
  • Height limit verification (15-21m residential)
  • Architectural + structural drawings per NA norms
  • Soil test coordination
  • Online portal submission + fee payment
  • Query response + revisions until sanction
  • Sanctioned plan handover with completion certificate path
  • Commercial: Fire-NOC + electrical load sanction
7-step process

From brief to sanctioned drawings

Typical timeline 5-9 weeks. NA approval is slightly longer than GNIDA.

1
Site survey + briefPlot measurement, FAR / setback calculation, family brief.
Week 1
2
2-3 layout conceptsFloor plans with Vastu overlay and Noida-specific zoning compliance.
Week 1-2
3
Selected layout refinedDimensioned drawings, room placement, openings.
Week 2-3
4
3D elevation renderPhotorealistic external + interior views · 2 free revisions.
Week 3-4
5
Structural & MEP drawingsColumn, beam, slab + electrical, plumbing layouts.
Week 4-5
6
Noida Authority submissionOnline filing, fee payment, query response, sanction.
Week 5-9
7
Final drawing handoverSanctioned plan, soft + hard copies, BOQ, material list.
Day of sanction
3D elevations

Selected elevation work for Noida

Plot-specific 3D renders across Noida sectors.

Vastu for Noida flats

Vastu integration — within apartment constraints

Even with locked plumbing stacks and fixed walls, we integrate Vastu at the layout stage.

What works in a Noida flat

  • Main entrance: workable around society-fixed door direction with Vastu remediation
  • Kitchen orientation: SE corner preferred — usually fixed by stack, we work with it
  • Pooja room: NE quadrant within the flat — flexible placement
  • Master bedroom: SW quadrant of the unit, far from kitchen heat
  • Bed direction: head SE or S, feet not pointing N
  • Bathroom placement: usually NW or SE — flat layout decides
Read the full Vastu primer →
Deliverables

What you get at sanction

Soft + hard copies. All COA-stamped. Valid for Noida Authority submission and resale.

Sanctioned plan setNoida Authority stamped drawings · 6 hard + soft copies
3D elevation rendersPhotorealistic external + 4 interior views · 2 free revisions
Structural drawingColumn-beam-slab layout · IS 456/IS 1893 compliant
MEP drawingsElectrical, plumbing, gas, AC ducting layouts
BOQ (bill of quantities)Itemised material list with brand recommendations
Vastu overlay diagramDirection-wise placement with explanations
FAR / setback diagramFAR calc · setback compliance · plot boundaries
Approval documentsSanction letter, fee receipts, completion certificate path
Common questions

Frequently asked questions

Do I need an architect for non-structural flat changes?

For purely cosmetic work (paint, finishes, fittings) — no. For wardrobe additions, modular kitchen, false ceiling — no. For wall additions/removals, layout changes, balcony enclosures, structural mods — yes, plus structural cert. Society NOC also typically requires architect-signed drawings for any visible change.

What's the architect fee in Noida vs Greater Noida?

Noida fees are ~25% higher: ₹15/sqft (basic) to ₹40/sqft (premium) vs Greater Noida ₹12-40/sqft. Drivers: Noida Authority overheads (longer approval cycles, more documentation), society liaison work, higher logistic costs for site visits across sectors.

How long does Noida Authority approval take?

5-9 weeks typical: 1-2 weeks drawings, 3-7 weeks NA approval. Stricter than GNIDA's 4-8 weeks. Online portal (since 2023) has reduced this; in-person visits still needed for some queries.

Who signs the architectural drawings?

Our architects are COA-registered (Council of Architecture). Drawings are signed, stamped, and submitted by them. Valid for Noida Authority, society NOC, bank loan documentation, and resale.

Can I use your architect with another construction contractor?

Yes — we offer architectural service as standalone. Our drawings work with any construction firm. You'll just need a separate contract with your contractor.

Just 3D elevation — without full plan service?

Yes — standalone 3D ₹3,500-10,000 per view. You provide the 2D plan, we create the photorealistic external/interior view. Useful for budget visualization or society NOC drawings.

How does flat combining (merging two flats) work?

Complex. Need: structural feasibility (load-bearing analysis), Noida Authority approval (since it changes the registered layout), society NOC, mortgage holders' consent if loans on either flat. We handle all paperwork — typical timeline 3-5 months.

Is structural certification mandatory for renovations?

For non-structural changes: no. For any wall removal or modification, balcony enclosure, floor addition, mezzanine — yes, mandatory. Cost ₹10,000-30,000 depending on scope. Society won't issue NOC without it for structural work.

How is RWA / society approval handled?

Society NOC requires architect-signed drawings, security deposit (refundable), indemnity letter, contractor PAN/GST proof. We prepare drawing set specifically formatted for society submission. Most societies process NOC in 1-2 weeks once papers are complete.

Can you do interior design drawings only (no exterior)?

Yes — interior-only design service: space planning, electrical layout, modular design, false ceiling drawings, 3D interior renders. Typical ₹2,000-5,000 per room. For full interior + execution, see interior designer service.

Do you cover Noida Extension and Greater Noida West?

Yes — all Noida Extension societies, Sec 1-16 Greater Noida West. Same fees and process. Greater Noida architect service for plotted projects.

What if my plot is in a notified zone with stricter rules?

Plot zone determines FAR, height, ground coverage, setbacks. Our site survey identifies zone-specific constraints upfront. Some zones (e.g., institutional, green belt) need additional clearances. We design within compliance — no rejection-prone shortcuts.

Start with a sanctioned Noida plan

Free first site visit · 3D in week 3 · Vastu-integrated · 92% first-pass NA approval

Frequently Asked Questions

Do I need an architect for non-structural flat changes in Noida?+

For purely cosmetic work (paint, flooring, modular furniture without wall changes), most Noida societies do not require architect-stamped drawings. But for any wall removal, plumbing relocation, electrical-load change, or balcony modification, the society NOC will almost always require architect-stamped drawings plus a structural-opinion letter.

What's the difference between architect and interior decorator?+

Architects handle structural, spatial, and approval drawings — load calculations, building plans, official submissions. Interior decorators handle aesthetic finishes — colour schemes, soft furnishings, decor selection. For any renovation involving walls or external changes, you need an architect. For pure surface refresh, a decorator is enough.

How much do architects in Noida charge compared to Greater Noida?+

Noida architect fees run 10-25% higher than Greater Noida equivalents because of higher commercial real-estate and specialist high-rise experience. Our Noida new-build fee is Rs 15-40 per sqft of plot; Greater Noida equivalent is Rs 12-30 per sqft.

How long does Noida Authority map approval take?+

A clean submission with complete documentation takes 30-60 days. Complex cases (FAR exceptions, zoning disputes, or missing ownership documents) can run 90-120 days. Our first-submission acceptance rate is approximately 95%, which shaves 4-6 weeks off typical timelines.

Who signs society-NOC drawings - the architect or the structural engineer?+

Both. The architect stamps the plan drawings (layout, elevation, service routing). A registered civil or structural engineer signs the structural opinion letter (load safety for any wall or beam modification). We include both in every society-NOC package.

Can I use an outside architect with Aarna's construction team?+

Yes - we work with any registered architect you bring. But we are a better fit when design and build sit in one team. Single accountability means we never have architect-versus-contractor blame games on site, and design changes move faster because nothing has to escalate.

Do you deliver 3D elevation or photorealistic render?+

Yes - every new-build architectural package includes at least 3 exterior 3D views. Interior packages include per-room 3D renders. Standalone 3D render (without full drawing set) is Rs 3,000-8,000 per view depending on complexity.

What happens if the first Noida Authority submission is rejected?+

We handle the revision at no extra fee up to two rejection cycles - as long as rejection reasons are within our control (drawing errors, documentation gaps, compliance misses). If you cause the issue (e.g., undisclosed encumbrance on the plot), revision is billed separately at cost.

Can you do architect drawings only, without your construction team?+

Yes. Design-only engagements are welcome. You get the full drawing set in PDF and CAD, with CAD source files editable by your contractor. Fee quoted is for drawings-only; site supervision during construction is available as an add-on.

Do you handle society-NOC paperwork end-to-end or just the drawings?+

End-to-end. We prepare drawings, the structural certificate, builder-specific declaration format, and coordinate with society management until the stamped NOC is in your hand. Turnaround is typically 10-15 working days from project start.

📞 Call Now 💬 WhatsApp