Services

Our Services

Quality Services

Since 2017, Aarna Constructions & Interiors has delivered turnkey construction services across Greater Noida, Noida, Jewar, and the Yamuna Expressway. Founded by Prashant Chaudhary, a former civil engineer with Delhi Metro Rail Corporation — infrastructure-grade civil engineering applied to residential construction, renovation, interior design, architecture, and complete building contractor services.

Construction services

Civil contractor & building contractor services · House · Villa · Commercial · Jewar Airport

Renovation services

Home · Bathroom · Kitchen · Old-flat transformation

Interior design services

Full-home · Modular kitchen · Office & commercial

Architectural services

Drawings · Map approval · Structural certs · 3D renders

Inspection & consulting

Home inspection · Cost estimate · Quotation PDF

Specialty services

Painters · Tile installation · Vastu consulting

Construction services Greater Noida — price list at a glance

Anchor rates for 2026 across Greater Noida, Noida, and Yamuna Expressway. Detailed breakdowns on each service page.

House construction (Greater Noida, basic)₹1,650/sqft
House construction (Noida, basic)₹1,800/sqft
Villa construction (YEIDA)₹1,850/sqft
Villa luxury (Ansal Golf Link)₹2,400/sqft+
Commercial shell₹1,400/sqft
Commercial fully fitted₹2,800/sqft
Factory / warehouse PEB₹900/sqft
Home renovation (2BHK)from ₹5 lakh
Home renovation (3BHK)from ₹8 lakh
Bathroom renovation₹80K – ₹3L
Kitchen renovation₹1.5L – ₹4.5L
Modular kitchen (L-shape)₹1.2L – ₹2.8L
Architectural drawings₹12 – ₹40/sqft of plot
Home inspection (2BHK)from ₹3,000

Materials, brands & standards we use

Branded on every invoice. Substitution without written consent is a contract breach.

SteelTATA Tiscon · JSW NeoSteel · SAIL · Fe500D · IS 1786
CementUltraTech · ACC PPC · IS 1489 compliant
StructureRCC raft / isolated footing · IS 456 · IS 1893 seismic
Brick & blockISI-certified clay brick · AAC blocks
Bath fittingsJaquar · Hindware · Kohler · Roca
Kitchen hardwareHettich · Blum · Hafele · marine ply / HDHMR carcass
PaintAsian Paints · Berger · Nerolac · Dulux
Tiles & stoneVitrified · ceramic · Italian marble · quartz · granite
Plumbing & electricalCPVC plumbing · copper wiring · modern MCB boards
📚 Guides & resources — pricing, checklists, comparisons see all 12 →

Why hire Aarna over local contractors

Eight reasons, eight icons — same accent across the page.

DMRC-grade civil engineering contractorLoad calcs, mix-design logs, cube tests on every concrete pour.
Named-brand materialsBranded on every invoice — substitution = contract breach.
Written warranty8 yrs structural · 5 yrs kitchen · 2 yrs hardware · 1 yr paint.
Construction project management via TrackovoDaily site photos, material receipts, milestone tracking in your pocket.
GST-registered billingOn-book invoices. Legal recourse if anything goes wrong.
200+ completed projectsDocumented log & references on request.
Founder accessibilityPrashant Chaudhary takes personal escalations.
Penalty-clause timelinesContracted delivery dates with delay-penalty protection.

Explore Our Latest Projects

A Showcase of Innovation and Excellence

Request a Quote

Ready to Work Together? Build a project with us!

Learn More From

Frequently Asked Questions

We specialize in construction, interior design, renovation, modular kitchens, custom wardrobes, and more. Our services cater to residential, commercial, and municipal projects in Greater Noida, Noida, and Jewar.

Call or WhatsApp +91 9582 58 1238, or fill the quote form on this page. We confirm a free site visit within 48 hours across Greater Noida, Noida, Jewar, and the Yamuna Expressway. Itemised quotation PDF arrives within 24 hours of the site visit — broken down by material, labour, and milestone payments.

Indicative timelines for 2026 deliveries:

  • House construction: 6-9 months for a 2,000 sqft 3BHK · 9-14 months for a villa
  • Commercial shell: 4-7 months · fully-fitted commercial 7-10 months
  • Home renovation: 4-12 weeks depending on scope (bathroom 2-3 wks · kitchen 3-5 wks · full 2BHK 8-12 wks)
  • Modular kitchen / interiors only: 4-8 weeks from final design sign-off

All projects are governed by a penalty-clause timeline contracted upfront — delays beyond agreed milestones trigger pre-defined compensation, applicable to both sides.

📞 Call Now 💬 WhatsApp