Case Study · Alpha 1 Villa

3-Floor Villa Construction Case Study — Alpha 1, Greater Noida

Aarna 2024 project: 4,200 sqft three-floor villa on a 350 sqm plot in Alpha 1. Premium-tier build with Indian premium finishes, structured smart wiring, 14-month foundation-to-handover. Rs 82 lakh turnkey.

Sector
Alpha 1, GN
Service
Villa construction
Built-up area
4,200 sqft (350 sqm plot)
Cost
Rs 82 lakh turnkey
Timeline
14 months
Project at a glance
350 sqm
Plot size
Mid-premium Alpha 1
3
Floors + cellar
G + 2 + small cellar
4
BHK + study
All bedrooms attached bath
Rs 1,950
Per sqft
Premium-mid tier

The owner brief

Returning NRI couple (UK-based for 18 years, two kids in international school) bought a 350 sqm corner plot in Alpha 1. Their brief: a 4BHK + study villa that felt like their UK home — clean lines, contemporary palette, lots of natural light, but engineered for Greater Noida summer.

They evaluated 4 builders over a year. Aarna won on three points: (1) Prashant's ex-DMRC engineering background convinced the husband (also an engineer); (2) we shared real cost data from 3 previous Alpha 1 builds; (3) NRI tracking via Trackovo + daily WhatsApp + monthly drone footage.

Project ran 14 months, on time, on budget. Family moved in July 2024.

What the brief looked like

Corner plot setbacks: Alpha 1 corner plots need 3m front + 2.5m side setback (extra 0.5m on side). We optimised footprint with cantilever balcony to recover usable upper-floor area.

NRI remote management: Family in UK throughout the build. Daily WhatsApp photo log + weekly Zoom + monthly drone footage. Family visited only at foundation, slab-completion, and final handover.

Premium-tier within budget cap: Brief had Rs 85 lakh hard cap. We delivered at Rs 82 lakh by sourcing Indian premium materials (vs imports) for the public areas, reserving imports for master bedroom + kitchen counter.

Cellar waterproofing: Owner wanted a cellar (servant + utility). We did crystalline waterproofing + membrane double-layer + dewatering pump pre-install. Cost: Rs 1.8 lakh; saved Rs 6-8 lakh retrofit risk.

Itemised cost breakdown

Phase / itemCostNotes
Excavation + foundation + plinthRs 8.4 LRCC raft, cellar prep
Cellar construction + waterproofingRs 4.2 LCrystalline + membrane
Ground floor RCC + masonryRs 10.5 LLiving + kitchen + 1 BR
First floor RCC + masonryRs 9.2 L3 BR + study
Top floor + roof slabRs 6.8 LOpen terrace + utility shed
Plumbing + electrical (full)Rs 7.2 LCPVC + concealed + smart-ready
Flooring (premium Indian)Rs 4.8 LIndian marble in public + porcelain BRs
Modular kitchen (premium)Rs 3.6 LHettich Titan + Caesarstone
Bathrooms (5 total)Rs 6.2 LHindware Italian + Jaquar Lyric
Painting + plastering + finishesRs 4.8 LRoyale Aspira interior, exterior Apex
Doors + windowsRs 6.5 LWood-look aluminium + safety glass
Landscape + outdoor lightingRs 3.4 LFront + side gardens, uplighters
PM + supervision + contingencyRs 6.4 L14-month dedicated PM + drone footage
TOTAL turnkeyRs 82.0 LWithin Rs 85L cap, Rs 1,950/sqft

Build timeline — week by week

1

Month 1: Plot survey + soil test + design concept

Demarcation, 16 t/m² soil capacity, 4 concept boards

2

Month 2: GNIDA sanction + RWA + foundation excavation

Sanction in 18 days, basement + plinth start

3

Month 3-4: Cellar + foundation + waterproofing

Crystalline + membrane double-layer, water test passed

4

Month 5-6: Ground floor RCC + first slab pour

M25 concrete, 28-day strength test passed

5

Month 7-8: First floor RCC + plumbing rough-in

Concealed conduit + CPVC water lines

6

Month 9-10: Top floor + roof + masonry complete

AAC blocks + plaster, weather-sealed

7

Month 11: Flooring + tiling + bathroom finishes

Indian marble in living + dining

8

Month 12: Modular kitchen install + paint primer

Hettich Titan + Caesarstone delivered + installed

9

Month 13: Paint final coat + lighting + landscape

Royale Aspira interior + Apex exterior

10

Month 14: Final fittings + snagging + handover

Light fixtures, soft furnishing, warranty handover

Materials & brands used

Fe500D TATA TMT steelUltraTech PPC cementAAC blocks (Magicrete)Indian premium marble (Makrana)Caesarstone Pure White kitchen counterHettich Titan + Blum hardwareHindware Italian Collection bathroomJaquar Lyric fittingsWood-look aluminium windowsAsian Paints Royale Aspira (interior) + Apex (exterior)CPVC Astral plumbingWipro + Havells lighting + switches

Project gallery

We were in the UK throughout the build. Daily WhatsApp photos + monthly drone footage + Trackovo dashboard meant we never felt out of the loop. Aarna delivered on month 14, exactly as promised. The Rs 82 lakh final cost was Rs 3 lakh under our cap.

— A. & T. Chaudhary, Alpha 1 villa, completed July 2024

NRI or busy owner? See our tracking demo

Daily WhatsApp + Trackovo dashboard + monthly drone footage — see how 30+ NRI Aarna clients followed their builds.

Call +91 9582581238
📞 Call Now 💬 WhatsApp