3-Floor Villa Construction Case Study — Alpha 1, Greater Noida
Aarna 2024 project: 4,200 sqft three-floor villa on a 350 sqm plot in Alpha 1. Premium-tier build with Indian premium finishes, structured smart wiring, 14-month foundation-to-handover. Rs 82 lakh turnkey.
The owner brief
Returning NRI couple (UK-based for 18 years, two kids in international school) bought a 350 sqm corner plot in Alpha 1. Their brief: a 4BHK + study villa that felt like their UK home — clean lines, contemporary palette, lots of natural light, but engineered for Greater Noida summer.
They evaluated 4 builders over a year. Aarna won on three points: (1) Prashant's ex-DMRC engineering background convinced the husband (also an engineer); (2) we shared real cost data from 3 previous Alpha 1 builds; (3) NRI tracking via Trackovo + daily WhatsApp + monthly drone footage.
Project ran 14 months, on time, on budget. Family moved in July 2024.
What the brief looked like
Corner plot setbacks: Alpha 1 corner plots need 3m front + 2.5m side setback (extra 0.5m on side). We optimised footprint with cantilever balcony to recover usable upper-floor area.
NRI remote management: Family in UK throughout the build. Daily WhatsApp photo log + weekly Zoom + monthly drone footage. Family visited only at foundation, slab-completion, and final handover.
Premium-tier within budget cap: Brief had Rs 85 lakh hard cap. We delivered at Rs 82 lakh by sourcing Indian premium materials (vs imports) for the public areas, reserving imports for master bedroom + kitchen counter.
Cellar waterproofing: Owner wanted a cellar (servant + utility). We did crystalline waterproofing + membrane double-layer + dewatering pump pre-install. Cost: Rs 1.8 lakh; saved Rs 6-8 lakh retrofit risk.
Itemised cost breakdown
| Phase / item | Cost | Notes |
|---|---|---|
| Excavation + foundation + plinth | Rs 8.4 L | RCC raft, cellar prep |
| Cellar construction + waterproofing | Rs 4.2 L | Crystalline + membrane |
| Ground floor RCC + masonry | Rs 10.5 L | Living + kitchen + 1 BR |
| First floor RCC + masonry | Rs 9.2 L | 3 BR + study |
| Top floor + roof slab | Rs 6.8 L | Open terrace + utility shed |
| Plumbing + electrical (full) | Rs 7.2 L | CPVC + concealed + smart-ready |
| Flooring (premium Indian) | Rs 4.8 L | Indian marble in public + porcelain BRs |
| Modular kitchen (premium) | Rs 3.6 L | Hettich Titan + Caesarstone |
| Bathrooms (5 total) | Rs 6.2 L | Hindware Italian + Jaquar Lyric |
| Painting + plastering + finishes | Rs 4.8 L | Royale Aspira interior, exterior Apex |
| Doors + windows | Rs 6.5 L | Wood-look aluminium + safety glass |
| Landscape + outdoor lighting | Rs 3.4 L | Front + side gardens, uplighters |
| PM + supervision + contingency | Rs 6.4 L | 14-month dedicated PM + drone footage |
| TOTAL turnkey | Rs 82.0 L | Within Rs 85L cap, Rs 1,950/sqft |
Build timeline — week by week
Month 1: Plot survey + soil test + design concept
Demarcation, 16 t/m² soil capacity, 4 concept boards
Month 2: GNIDA sanction + RWA + foundation excavation
Sanction in 18 days, basement + plinth start
Month 3-4: Cellar + foundation + waterproofing
Crystalline + membrane double-layer, water test passed
Month 5-6: Ground floor RCC + first slab pour
M25 concrete, 28-day strength test passed
Month 7-8: First floor RCC + plumbing rough-in
Concealed conduit + CPVC water lines
Month 9-10: Top floor + roof + masonry complete
AAC blocks + plaster, weather-sealed
Month 11: Flooring + tiling + bathroom finishes
Indian marble in living + dining
Month 12: Modular kitchen install + paint primer
Hettich Titan + Caesarstone delivered + installed
Month 13: Paint final coat + lighting + landscape
Royale Aspira interior + Apex exterior
Month 14: Final fittings + snagging + handover
Light fixtures, soft furnishing, warranty handover
Materials & brands used
Project gallery
We were in the UK throughout the build. Daily WhatsApp photos + monthly drone footage + Trackovo dashboard meant we never felt out of the loop. Aarna delivered on month 14, exactly as promised. The Rs 82 lakh final cost was Rs 3 lakh under our cap.
NRI or busy owner? See our tracking demo
Daily WhatsApp + Trackovo dashboard + monthly drone footage — see how 30+ NRI Aarna clients followed their builds.
